Company Dashboard - Overview

This video walks you through everything you see on the Dashboard when you first log in.

 

SmartPM Menu Bar

On the top menu bar of the SmartPM Dashboard, you will see the following icons you can select:

 

Dashboard

Clicking on the Dashboard icon will bring you back to the home page, the SmartPM Dashboard

 

Resources

Clicking on the Resources icon will show you options on a drop down menu including

  • Support email support@smartpmtech.com
  • Support phone number 404-329-3000
  • Link to download Chrome
  • The ability to show/hide tutorial pop ups
  • A quickstart guide you can download

 

Admin

Clicking on the Admin icon will take you to the Admin Dashboard where you can set up:

  • Metadata
  • Global Configuration
  • Users
  • Integrations
  • Quality Profiles

 

Feature Request

Clicking on the Feature Request icon will bring you to a Feature Request Form.

You can request new features that you would like to see in SmartPM or make suggestions for features that already exist. 

 

Help

Clicking on the Help “?” icon will take you to the SmartPM Help Center where you can search for answers to questions or learn about scheduling and get SmartPM training.

 

Logout

Selecting the Logout icon will log you out of the SmartPM application.

 

SmartPM Package

Right below the SmartPM menu bar, you can see the number of Dashboard, Oversight and Controls project slots you have in your SmartPM package.  

 

Overview

The Overview will summarize the status of all of your projects and show you the number of projects:

  • Delayed
  • With Low Quality
  • That Need New Schedules
  • On Track

Clicking on one of these Status Overview buttons will filter all of the projects with that status.

 

Search

Clicking in the Search box will allow you to search by project name.

 

Filter

Clicking in the Filter box will allow you to use the filter to filter by meta data tags you previously set up.

 

Add New Project

Clicking on the “+Add New Project” button will allow you to create a new project and upload a baseline schedule

 

Quality Checker

Clicking on the green Quality Checker button will allow you to import a schedule and print a quality report as well as export the quality issues in an Excel spreadsheet.

 

Project Health

Project Health is calculated by a combination of other project metrics. It adjusts over time, and it adds importance of various metrics at different points in time based on earned value

 

Schedule Performance Index

The Schedule Performance Index (SPI) is your actual progress over your planned progress. Plan progress is calculated from the baseline and actual progress is calculated from the most recent update. 

 

Critical Path Delay

The critical path delay is how many days had the job been delayed on the critical path.

 

Future Acceleration

Future acceleration indicates changes to the schedule that have been made to reduce the duration of activities. It is the cumulative amount of end date variance based solely on changes to the plan schedule to date. This is a calendar day figure.

 

Schedule Quality

The schedule quality grade is an indicator of the feasibility of the schedule and is derived from the schedule quality profile metrics and how closely the schedule adheres to the standards.

 

Schedule Compression

Compression as a metric of how much will need to be done for theremaining duration of the job compared to the work originally planned.

 

Forecasted Completion

The forecasted completion date will become apparent once you surpass 50% complete and will indicate within what time frame the forecasted completion date will be.

 

Menu Below the Project Summary

  • Manage Schedules:Manage Schedules allows you to upload new schedule updates or replace schedules
  • View Trends:  The trend graphs include: Planned versus Actual percent complete over time, Quality over time, Project Health over time, Changes over time, Schedule Quality over time, Delay and Acceleration over time, Compression over time. 
  • Summary Report: The summary report is a one page report that shows the planned versus actual progress,recent delays, project summary, milestones and total changes.
  • SmartPM Report: The SmartPM Report allows you to group by activities or by WBS structure and provides a Quality Report, Gantt Chart, and Delay Table
  • Comments: The comments button allows you to add comments to a project
  • Delete Project: The Delete Project button allows you to delete a project.