Skip to content
  • There are no suggestions because the search field is empty.

Release 5.2 - June 10, 2022

  • New Login
  • Update Project Workspace Cards to Allow Swapping Places
  • Add duration information to Project Workspace 
  • Add ability to switch key milestone when drilled into specific data from Project Workspace
  • Add support for printing Summary Report with Activity Code Description
  • Add Slot Usage per Project to Company Dashboard
  • Add future near critical path to Gantt
  • Add internet connection disconnect detection
  • Add Required indicator to Paper Size on Schedule Summary
  • Advanced Model, limit conditions to those applicable based on schedules selected
  • Improve permission check performance
  • Prevent entering incorrect location information
  • Fix issue with special characters in password
  • Fix calendar analysis missing changes
  • Fix issue with searching on User List
  • Fix issue with removing schedules with baselines created on them
  • Fix issue with trends not removing loading indicator