Release 6.15 - September 1, 2023

  • Add Ability to Unsubscribe from Analysis Complete Emails

  • Add Ability to Subscribe to Automated Reports (beta)
  • Add Ability to Subscribe to Notifications (beta)
  • Add ability to group SHS/SHF report by activity code and WBS
  • System Stability Improvements
  • New and Improved Trends Report Print
  • Improve batch Change Log Flagging for large batches
  • Add "(.MPP Only)" to "Summary Bar Logic Ties" "Manually Scheduled Summary Tasks" "Manually Scheduled Activities" in the schedule quality editor
  • Fix an issue causing the scroll bar to disappear when Echo Notification appears
  • Fix an issue causing duplicate daily reports in the Delay Analysis
  • Fix an issue causing Project Create to fail after selecting a Contractual End Date before uploading the Baseline Schedule
  • Ensure the Procore integration does not ask to import previously excluded files
  • Reactivate the direct E-Mail button in reports
  • Add Trends print and export buttons back
  • If an activity does not have an assigned WBS, put it on top of the level one WBS when WBS grouping is turned on
  • Fix on the Executive Dashboard where pulling up the project list for an index that is hidden on company default (but not hidden on a project's quality profile) causes a failure
  • Ensure the user can only create logic with activities from the selected schedule when building Change Conditions
  • Fix an issue causing an error while changing the Data Date with the Activity Details pane open
  • Fix an issue causing Remaining Durations to update incorrectly when there is not a timestamp in the native file
  • Add requirements to submitting a Historical Weather Report Request