Release 6.31 - April 12, 2024

  • Custom Reporting (BETA)
    • Add live metrics to the General Text component
    • Fix an issue with the generation of SHS/SHF
    • Add an SPI component to the Info section
  •  Reporting
    • Change the Narrative Report back to landscape mode for subscriptions
    • Add the reason for an analysis failure to the Failure Notification Email
    • Fix company logo scaling in report headers
  • Gantt Chart
    • Add Cost and Man Power columns
    • Left Pane Export upgrades and fixes
  • Enhancements
    • Add a loading indicator when switching models
    • Optimize the Change Log table and export
    • Procore sync upgrades
    • Better formatting on smaller screens
  • Fix an issue causing linked LOE activities to fail an analysis
  • Ensure failed Models are removed from the UI