Skip to content
  • There are no suggestions because the search field is empty.

Release 9.15 October 3, 2025

New Features

  • Schedule Range Override for Custom Reports Charts: We've introduced a Schedule Range Override feature for Custom Reports charts, giving users greater flexibility to define the data window displayed in charts based on the selected schedule at the time of the request. This feature is configurable per chart during creation or editing, allowing users to filter data by either time or the number of schedule updates. Here's how it works:

    A new "Schedule Range Override" button appears at the top of the chart configuration page, offering three options:
    • Default: Displays data across the entire timeline of the report, based on the selected model and scenario, consistent with standard report generation.

    • Latest Schedules: Shows data from a user-specified number of recent schedules. For example, selecting "5" will display data from the five most recent schedule files uploaded when running the report against the latest file.

    • Rolling Time Frame: Allows users to define a time window (e.g., the last 30 days) from the selected schedule, displaying only the data within that period.

    Unlike rebaselining, this feature does not alter the underlying data or baseline. It provides a focused view of current metrics by filtering out older, less relevant data for a more localized perspective.

  • Restrict Reporting Access: To enhance data security and control, we've added a Restrict Reporting Access option for system administrators. This feature allows admins to prevent users with company user roles from viewing, printing, or exporting reports or report-related functions in SmartPM.

    To enable this restriction:
    • Navigate to the Admin menu.

    • When adding or editing a user, check the Restrict Reporting Access box.

    This ensures sensitive data remains protected and accessible only to authorized personnel.

Bug Fixes

  • Should Start/Finish Report: Resolved a visual issue where the outline around counts was missing, improving readability.

  • Zip Codes: Added missing zip codes for the Dominican Republic and the Cayman Islands to ensure complete regional coverage.

  • Project List: Optimized load times for the project list, resulting in a faster and smoother user experience.