Release 9.37 August 10th 2026
Bug Fixes
- Checklist: Fixed an issue where navigation always redirected back to the main checklist page.
- Predicted Completion Date: Fixed an issue where a single date displayed instead of a date range when the client selected that setting.
- OPC Integration: Fixed several issues affecting the integration.
- Should Start/Finish page: Fixed an issue where the page wasn't respecting the configured float setting (native vs. SmartPM). Also fixed an issue with grouped data.
- Suggestions: Fixed an issue with the link for submitting suggestions.
- Knowledge Base: Fixed an issue with in-app links to the Knowledge Base.