Skip to content
English
  • There are no suggestions because the search field is empty.

Release 6.12 - July 21, 2023

  • Add the Notifications pane in BETA
  • Add the User Profile Settings section
    • Add the ability to designate a user-specific SmartPM Home view
    • Add the ability to designate a user-specific SmartPM Company
  • Trend Charts / Project Workspace
    • Add the Velocity Trend
    • Add Forecast and Baseline Curves to the Earned Schedule Trend
    • Show compression for periods when compression was available
  • Summary Report
    • Add Summary Report generation based on selected milestone
    • Add the ability to view historical Summary Reports
    • Add a loading indicator
  • Gantt Chart
    • Add Late Date columns to the Gantt Chart
    • Add Driving Logic indicators to the Gantt Chart
    • Add Physical % Complete column to the Gantt Chart
    • Add Unit % Complete columns to the Gantt Chart
    • Add Physical % Complete curve to the Field Log
    • Add a loading indicator when data date is changed
  • Add a Quality Profile option to force P6 Out of Sequence tracking protocols
  • Add a Global Configuration to remove "AddedCalendarWorktime" Change Types from the Change Log when they are created due to a newly added calendar
  • Schedule Import/Delay Analysis Changes
    • Add support for Resume Dates from MPP schedules
    • Enhanced import handling of remaining duration changes for activities being tracked against physical percent complete
    • Fix an issue with tracking activities in PPX projects
    • Fix an issue causing duplicated WBS Structures on XML updates
    • Better handle XML schedules where Actual Dates are null
    • Fix an issue causing Advanced Model failures with Bulk Changes involving added calendars without the schedule where the calendar was added
  • Better handle Google Chrome's auto-fill issue
  • Add ability to filter projects, scenarios, and schedules based on update date for public API
  • Fix period in project metadata field name causing issues
  • Numerous backend enhancements