Release 6.23 - December 22, 2023
- Contractual End Date Metrics pt. 2
- Add Global Configuration "Point of Slippage Calculation"
- Changes when "Point of Slippage Calculation" is set to Contractual
- The Company Dashboard displays "Contractual Days Late" in place of scheduled "Days Late"
- The Company Dashboard displays "Contractual End Date" in place of "Baseline End Date"
- The Company Dashboard displays "Scheduled End Date" in place of "Current End Date"
- Additional Contractual End Date and Milestone Float information is added to the "Current End Date" section of the Narrative Report
- Add the Milestone Float column to the Delay Table and Summary Trends Table
- Custom Reporting - ALPHA Phase
- Add the ability to create a limited Custom Report at the Project level for Schedule Admins.
- Add Excel Export for the Executive Dashboard "Projects" Card
- Better handle situations where the Remaining Duration on an already started activity is increased
- Add cross-tab session refreshing.
- Collapse dropdown menus when clicking anywhere off of them
- Add Project, Model, and Milestone names to Subscription email subject lines
- Ensure the Late and Early Date Progress Curves diverge starting at the baseline schedule.
- Fix a rounding issue causing the number of Critical Path Activities identified by Schedule Quality to be different than what is shown in the Gantt Chart.
- Fix an issue causing SmartPM to misidentify activities as Out-of-Sequence.
- Fix an issue causing the Executive Dashboard Initial Set Up modal to reload
- Fix where the Data Date on the Trends Graphs generated by a Subscription contained incorrect formatting.
- Update the Change Log to ignore Constraint Changes when they occur due to Microsoft Project's scheduling processing.
- Fix an issue with manually setting the Data Date on import for Microsoft Project
- Limit float values to two decimal places in the UI
- Fix an display issue causing LOE exclusion in the Schedule Quality Editor to show as Milestone exclusion.
- Fix an issue causing circular logic when running Advanced Models with Revert and Reject