Skip to content
English
  • There are no suggestions because the search field is empty.

Release 6.26 - February 2, 2024

  • Increase speed and efficiency of data loading
  • Add multi-select filtering capability
  • Add the ability to manually trigger Project Subscriptions
  • Customizable Report (ALPHA)
    • Add company-level report creation
    • Add Narrative Report cards
    • Add cards related to the Company Dashboard
    • Add Delay and Calendar Changes Table cards
  • Reporting
    • Add the Global Configuration "Should Have Started / Finished Float Column" to force the Native File Float to populate the SHS/SHF Float columns
    • Fix where donut charts in the SHS/SHF report would stop adjusting after a filter was set
    • Restore filtering to the SHS/SHF report table
    • Fix an issue causing the SHS/SHF report to only generate the last window
    • Fix where the SHS/SHF would not print when a filter was applied
    • Restore scalability to the Compression Trend
  • Importing and Scheduling
    • Add truncating to any activity name over 128 characters
    • Add alert for files over 150MB in size
    • Adjust retained logic based on .MPP settings
    • Ensure SmartPM schedules correctly when considering the planned start date and should have started date 
    • Better handle .XER files with "null" values
  • Fix coloring on the map in the Executive Dashboard